Intel Ireland Limited Apply for Expansion

Intel Ireland Limited have applied for 10 year permission at Leixlip for buildings and ancillary works, alongside existing site infrastructure and buildings, all operating as an integrated campus, for the manufacture of integrated circuits.

 The proposed development includes:

  •  manufacturing buildings with a total gross floor area of 162,536 sq.m,
  • roof mounted stacks (ranging in height from 4.5m to 15m above parapet),  
  • associated cooling towers (17m high);  
  • a multi storey car park accommodating 2,200 cars,
  • a chemical store of 1,244 sq.m
  • 5 number water tanks 32m in diameter and 7m high

 This application will require notification to the EPA owing to a variation to the existing licence. An Environmental Impact Statement and a Natura Impact Statement accompany the application.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s


%d bloggers like this: